Comprehensive Solution for Cooling, Heating, and Ventilation in an Office Building
Commissioned by installation company G. Voltman, we contributed our knowledge and advice to project OWM, an insurance company in Aalten. A fine new-build project in which we were involved from the initial advice meeting through to the commissioning of various installations.
For this project, we provided the complete air handling: a total solution that ensures the entire office building is cooled, heated and ventilated sustainably.
We supplied 2 Fujitsu AE-10 Alfea Extensa 10 heat pumps in a cascade configuration. Using cascade control, these two heat pumps run via the buffer tank. This keeps the entire building at the set temperature as standard.
The Mitsubishi Electric multi VRF R2 system allows the temperature to be controlled independently in each room. Cooling or heating can therefore be controlled per room, and the energy exchange between rooms results in very high efficiency.
For the ventilation of the building, a Salda RIRS 2500 HEL EKO 3.0 heat recovery unit with a rotary heat exchanger has been installed on the roof. This air handling unit achieves a heat recovery efficiency of 85.2% according to NEN 308. The unit is equipped with a 9 kW electric heating coil to control the supply air temperature. The supply air of the heat recovery unit is connected to the VRF system.